IR NIK MANSUR

WATER RESOURCES EXPERT (FLOOD & DRAINAGE)

Ir. Nik Mansor Bin Nik Mat graduated with a Bachelor’s degree in Civil Engineering from Universiti Teknologi Malaysia (UTM) in 1993. He is a member of several professional organizations, including the Board of Engineers Malaysia (BEM), the Institution of Engineers Malaysia (IEM), and the Asian Chartered of Professional Engineers (ACPE).

Ir. Nik Mansor is a Professional Engineer with a wealth of experience in both construction and consulting, having worked with various organizations in Malaysia and abroad. His expertise lies in infrastructure engineering, where he has been involved in a diverse range of projects, including mixed developments, roads, highways, light rail transit (LRT), mass rapid transit (MRT), bus rapid transit (BRT), electrified double track railway, township development, as well as stormwater drainage systems and flood mitigation efforts.

PROJECT MANAGER/CHIEF INFRASTRUCTURE ENGINEER

(HSS INTEGRATED SDN BHD)

He actively managed and contributed to the infrastructure project throughout all phases, including planning, design, independent checking, project management, and construction for the following projects: Subang Airport Redevelopment Plan (SARP), BRT Iskandar Johor, East Cost Rail Link (ECRL) Dungun to Kota Bharu, RAPID Pengerang Johor, MCKIP2 Industrial Park Pahang, KVMRT Line 2 (SSP Line), KVMRT Line 1 (SBK Line), Kwasa Damansara Township Development, Bandar Bukit Raja (BBR Phase 1), Pasir Mas Halal Park (Phase 2) Kelantan, SUKE Expressway, Manjung Coal Unit 4-1 x 1000 Megawatt Power Plant Malaysia Perak, Maju Expressway (MEX1 & MEX2), Electric Double Track Project (Northern and Southern Line), New Low-Cost Carrier Terminal (LCCT) at KLIA, Masterplan Study for Kuantan Port City Pahang, Detailed Design of Sg Muar Flood Mitigation Works (Phase 1) Johor, Proposed Nad Al Sheba Race Course on Parcel 600-6888, Nad Al Sheba, Dubai, Proposed Mixed Use Development on Plot 611-122, Bu Kudra, Dubai, Masterplan Study for Madinat Al-Arab Dubai, Kajang Seremban Highway (LEKAS), Ipoh Lumut Link Road and Diamond Interchange Perak, East Coast Expressway ECE II (Bukit Besi to Bukit Payung Terengganu), Extension of Penang Bridge and LRT Ampang Lines.

PROJECT MANAGER/SENIOR ENGINEER

(JURUTERA PERUNDING ZAABA SDN BHD)

Contributing and assisting to the development of stormwater drainage systems, flood mitigation initiatives, dam projects, and associated infrastructure during the phases of planning, design, and construction: Detailed Design of the Drainage and Flood Mitigation for Cukai Kemaman Terengganu, Feasibility Study of Paya Peda Dam Besut Terengganu, Detailed Design of Small Reservoir, Detailed Design of Sg Aur Dam Pahang Tenggara Pahang, Detailed Design of the Flood Mitigation Works for Sg Muda Kedah, Federal Highway Road Improvement (Road 8) from Bentong to Kuala Lipis and Construction and Completion of the Drainage and Flood Mitigation Works for Sg. Muda Kedah.